We are now waiting for countertops- 3 weeks!  They will be this color of silestone.  The black sink and faucet will go in at the same time.

While we are waiting,  we will put the trim on that covers the bottom toekick, and the crown molding at the top of the cabinets.  Handles and knobs will need to be installed, and we still need to put in the cabinet above the fridge and the microwave above the stove.   I also still need to make allll the tiles for the backsplash O_o .  That will take a while!  Still not sure if I am going to do a pattern, or textures, or what.  I’m thinking a diagonal, though, to tie in with the floor, and definitely floating blue in color: